Project Description:
- 2 Towels, 4-harness draft
- 16 EPI, 16 PPI
- Warp length: 95” (Allows for 36” loom (thrum) waste)
- 5” in reed
Equipment Needed:
- 4-harness Loom with at least 18-inch weaving width, 8 dent reed.
- A stick or boat shuttle and bobbins
Yarn Needed:
- 1- 1.5 oz cone 5/2 Tubular Spectrum™ mercerized cotton yarn each: 10 Green Yellow, Forest, Burnt Umber, 10 Blue
- 2- 1.5 oz cone 5/2 Tubular Spectrum™ mercerized cotton yarn: Cranberry
- 1- 2 oz cone 5/2 Tubular Spectrum™ mercerized cotton yarn- Copper
Reviews
There are no reviews yet.